Friday, January 27, 2006

home improvement diary2

january 24

moved some stuff (mostly books, files and pictures) when eric arrived from work. we went back and forth thrice.

january 25

tito rod accompanied us to bunnings in thornleigh to buy all the painting materials that we need. we decided on dulux garden pond (green), arctic daisy (yellow) and blue oar (blue).

january 26

australia day was spent preparing and painting the master's bedroom and study. tito rod was in charge of filling the holes and gaps while eric and aris were painting the ceiling. i, on the other hand, was in charge of painting the wooden frames of the windows and doors with varnish (using wattyl gloss stain and varnish in teak).

we had problems with the ceiling in the master's bedroom as the paint seem to peel when it dries. i think it has something to do with the old paint so we might have to strip the ceiling first before applying the dulux white ceiling paint.

0 Comments:

Post a Comment

<< Home